Case Study:

The SPA Pipeline

Client:

Anglian Water

Principal Contractor:

J N Bentley

Project Overview

The SPA Pipeline, a major 580 km, £1.8 billion project.

  • The water table is too high to lay the pipeline in some areas.
  • Urgent wellpoint dewatering is needed to continue construction.
  • We respond immediately, with the capacity, skills and manpower, owned vehicles, exacting design, plant and equipment.
  • Team Alba always has a solution to groundwater control problems.
  • Working on behalf of a major East of England utility company,

Keeping taps running with fresh, clean water.

Accreditations Include:

- ISO 9001 (Cert. No. 11653)
- ISO 14001 (Cert. No. 11653)
- ISO 45001 (Cert. No. 11653)
- Constructionline, Gold.
- Achilles UVDB Silver +
- CHAS Accredited Contractor
- Builders Profile Safe Contractor

Project Case Studies

Dedicated Dewatering Specialists

For fast, reliable support throughout your next Dewatering or Groundwater Control project: